Ultimate Potential

Mehsana–Palanpur Section, Gujarat

Project Overview

The Mehsana–Palanpur section in Gujarat was proposed for doubling under an EPC contract. 

Translink was engaged by a prospective bidder to provide pre-bid advisory, with the objective to understand corridor conditions, scope risks, and cost implications before finalizing the bid strategy.

Scope of Work

Pre-bid Advisory

Corridor Length

65.1 km

Estimated Project Cost (Cr)

193

Client & Authority

Perfect Infracorp Private Limited & Western Railway

Scope of Work

Pre-bid Advisory

Corridor Length

65.1 km

Estimated Project Cost (Cr)

193

Client & Authority

Perfect Infracorp Private Limited & Western Railway

Challenges

The tender required careful interpretation of technical provisions, with multiple site constraints—such as existing track interfaces, limited working windows, and scattered utilities—adding uncertainty to quantities and effort. 

Assessing construction feasibility, sequencing requirements, and potential cost exposures within a short bid-preparation timeline was a key challenge.

Solutions

Translink undertook a review of tender documents, site conditions, and engineering requirements to build a realistic view of scope obligations. Critical work items, risks, and cost drivers were identified, supported by practical construction assumptions and phasing considerations.

This enabled the contractor to frame a balanced technical approach and an informed pricing strategy.

Impact

The pre-bid inputs provided the bidder with clarity on risks, resource needs, and feasible execution pathways, strengthening both competitiveness and bid accuracy.

View More Projects

Highway

National Highway Sections in Bongaigaon, Assam

Scope of Work

Road Safety Audit

Corridor Length & Configuration

127.8 km & 4 lane
Highway

Kanpur–Lucknow Expressway, NH27, Uttar Pradesh

Scope of Work

Road Safety Audit

Corridor Length & Configuration

62.8 km & 6 lane
Highway

Chittorgarh–Kota Section, NH27, Rajasthan

Scope of Work

Road Safety Audit

Corridor Length & Configuration

160.5 km & 4 lane