Ultimate Potential

Four-Laning of Gadu–Porbandar Coastal Highway

Project Overview

As part of the four-laning of the Gadu–Porbandar corridor, Translink provided detailed engineering design for a 93.5 km coastal highway. Our solutions optimized alignment geometry, pavement design, and safety features while ensuring constructability and cost efficiency.

Scope of Work

Detailed Engineering Design

Corridor Length & Configuration

93.5 km & 4 Lane

Estimated Project Cost (Cr)

533 Cr

Client & Authority

National Highways Authority of India

No. of Toll Plazas

2

Status

Completed

Scope of Work

Detailed Engineering Desig

Corridor Length & Configuration

93.5 km & 4 Lane

Estimated Project Cost (Cr)

533

Client & Authority

National Highways Authority of India

No. of Toll Plazas

2

Status

Completed

Impact

The project strengthens regional trade routes, reduces travel time by nearly 30%, and improves socio-economic connectivity across the Saurashtra coastline.

View More Projects

Highway

National Highway Sections in Bongaigaon, Assam

Scope of Work

Road Safety Audit

Corridor Length & Configuration

127.8 km & 4 lane
Highway

Kanpur–Lucknow Expressway, NH27, Uttar Pradesh

Scope of Work

Road Safety Audit

Corridor Length & Configuration

62.8 km & 6 lane
Highway

Chittorgarh–Kota Section, NH27, Rajasthan

Scope of Work

Road Safety Audit

Corridor Length & Configuration

160.5 km & 4 lane